Details » The Past and Future Kingdom
- Url: http://medievalkingdom.informe.com/
- Category: Teens
- Description: This is a site where teens can hang out and enjoy themselves online
- Members: 0
- Created On: Jun 9, 2007
- Posts: 0
- Hits: 9790
- Rating:
Post your rating:
User Comments:
1.
| Jan 7, 2018
rQqW5W https://goldentabs.com/
2.
| Jan 7, 2014
Hi FredWith or without PSE&G sniosnropg the luncheon those lines will be built. They will be built with or without approvals from the BPU as well. PSE&G has skipped the local municipal process because, rightly so, it is useless. How many elected officials would take an objective look at the real issues knowing many voters are upset. The idea of conducting informational meetings in all towns affected is fine. It is also always good form to listen to concerns and address issues presented. Again, to think that any town would publicly endorse this project is pure nonsense. Now while the BPU is being represented as the approval entity the reality is they to could very easily by bypassed and over ruled by the federal agencies. So this brings me to the nagging question in Montville Township as I sit as a township Committee member. Why don’t towns focus on the safety concerns and clear cutting issues? Even PSE&G has stated they are willing to take EMF measurements to bench line EMF on the existing 230KV line. Of course my 2 cent opinion is our BPU should mandate these measurements for all towns and force PSE&G to document the test equipment and methods used as well as taking those measurements in the summer months when usage is at its highest. The reality is that the possibility does exist the EMF levels could be lower with the new transmission line because some of the EMF would cancel out since two transmission lines will be operating on the same towers.Art Daughtry
3.
| May 3, 2013
Good points all aurond. Truly appreciated.